An 8-meter hydromechanical generator

We have built a working test rig, developed a test methodology and completed a full engineering design package. The next step is an 8-meter unit. Two members have already joined; 2 seats are open.

Discuss joining on Telegram →
Direct Telegram contact — Sergey from the team will answer your questions.
8 m
unit height · ⌀1 m · 35 floats · ≈3 t
≈$97,800
full budget — 259 items, open down to every bolt
$50,000
club entry · 4 members, 2 seats taken
≈7 mo
from production prep to acceptance

Done so far

Where the money goes

Production preparation and steel procurement — per an open, standards-referenced specification.
Part manufacturing and sub-assembly: multiplier, distributor, electrical unit.
The 8 m column shell, final assembly, hydro tests, commissioning.
Installation at the site in Uzbekistan and the measurement program.

Plainly said

This is an experimental engineering project, not a financial product. We do not promise returns and do not guarantee performance that has not yet been measured. Participation funds the construction of a specific machine under an open budget with full reporting: telemetry, test protocols and session logs are available to members. The goal is an instrument-verified result an external auditor can trust.

What a member gets

Message us on Telegram →